a construction site with scaffolding and scaffolding on the grounda stack of wooden pallets sitting on the grounda construction site with scaffolding and scaffolding on the side of the buildingyellow scaffoldings on the side of a building under constructiona construction site with a lot of scaffolding and a lot of scaffoldinga construction site with scaffolding and scaffolding on the side of the buildinga truck that is parked on the side of the roada picture of a large wooden box with some tools in ita construction site with a lot of construction equipment on ita lot of construction equipment that are on the side of a buildinga close up view of a construction site with a lot of machinerya pile of wooden pallets sitting on the grounda pile of wooden pallets sitting in the grassa large pile of wood sitting on the side of the roadseveral pieces of wood are stacked on top of each other in a pilea large pile of wood sitting on a pallet
Description
OUTINORD steel formwork – 1st floor: 4 x 280 cm x 60 cm 15 x 280 cm x 250 cm 4 x 280 cm x 125 cm 10 x 50 cm x 250 cm 4 x 50 cm x 125 cm 1 x 50 cm x 250 cm 1 x 50 cm x 180 cm (line 247 of the inventory) and then we add... OUTINORD steel formwork – ground floor and ground level: 6 x 280 cm x 250 cm 3 x 280 cm x 250 cm 1 x 50 cm x 125 cm 1 x 50 cm x 62 cm 19 x 50 cm x 250 cm (line 248 of the inventory)
See original version (French)
About the sale SALE VII – LJ SAONE BTP CONSTRUCTION
Auction location
Auction time 10/30/2026 at 11:00 AM
Pictures credits: Contact the Auction House
You may also like