three doors on the side of a building with a sky backgroundan image of a small building in the middle of a fielda picture of a door with a sign on ita picture of a wall with a bunch of signs on ita picture of a refrigerator with stickers and magnets on ita picture of a bathroom with a toilet and a sign on the walla sign posted on the wall of a restrooma room with a bunch of appliances in ita white refrigerator in the middle of a room that is being remodeled
Maître Frédéric DELOBEAU

50 - 3 delivery substations
See original version (French)

Estimate €45,000 - €65,000
Description
3 delivery substations Sold with prefabricated cells (to be collected) - U1900 delivery substation, 9 SCHNEIDER high-voltage electrical cells, model N5500 - 1 ENEDIS feed-in No. 1 / 1,250 amperes / 20,000 volts / 50 hertz - 1 ENEDIS feed-in No. 2 / 1,250 amps / 20,000 volts / 50 hertz - 1 outgoing feed to U1910 / 1,250 amps / 20,000 volts / 50 hertz - 1 20,000 Volt / 50 hertz meter - 1 main circuit breaker / 1,250 Amps / 20,000 Volts / 50 hertz - 1 feed to C13-100 coupling / 1,250 amps / 20,000 volts / 50 hertz - 1 feed from U1920 / 1,250 amps / 20,000 volts / 50 hertz - 1 feed-out to 2030 / 1,250 amperes / 20,000 volts / 50 hertz - 1 feed-in from U2020 / 1,250 amperes / 20,000 volts / 50 hertz --Utility delivery substation U1910 5 SCHNEIDER high-voltage electrical cells, model SM6/RM6 - Incoming feed from Ynsect PL U1900 / 630 amperes / 20,000 volts / 50 hertz - 1 meter / 20,000 volts / 50 hertz - 1 supply from U1920 emergency power unit / 630 amps / 20,000 volts / 50 hertz - to SST-GF-U02010 / 630 amps / 20,000 volts / 50 hertz - from STT boiler room U2000 / 630 amps / 20,000 volts / 50 hertz - U1920 emergency delivery substation 4 SCHNEIDER high-voltage switchgear units, model SM6 / RM6 - 1 ENEDIS emergency supply / 630 amps / 20,000 volts / 50 hertz - 1 meter / 20,000 volts / 50 hertz - 1 U1910 feed-off / 630 amps / 20,000 volts / 50 hertz - 1 U1900 feeder / 630 amps / 20,000 volts / 50 hertz The purchaser of these 3 high-voltage delivery substations must go through ENEDIS for any dismantling work - De-energisation - Sealing (fitting of two padlocks) - Verification that the power has been switched off - Securing and marking the area All of this must be carried out in collaboration with the site’s technical manager Presentation of authorisations for the employees involved Completion of the handover by 31 October 2026 at 3.00 pm; return of the building to its owner on 31 October 2026; any equipment not removed by 31 October 2026 will be deemed to have been abandoned on site without compensation
See original version (French)
Pictures modified on 09/21/2026 at 5:09 PM
Lot description modified on 09/21/2026 at 5:09 PM
Pictures credits: Contact the Auction House
You may also like